What drives the cost before drywall
The pre-drywall phase is where a gut remodel's budget is largely decided, because it is the stage that uncovers what the house is actually made of. These are the factors that move the number most:
Age of the property. Pre-1978 housing brings lead requirements into scope, and older construction frequently needs electrical service and plumbing upgrades before new work can connect to it.
Hazardous-material findings. Asbestos in flooring, mastic, duct wrap, or texture changes both the abatement scope and the demolition sequence.
How much structure moves. Removing a bearing wall adds engineering, a beam, and the posts and footings that carry it. Keeping the wall avoids all three.
Panel and service capacity. If the existing service cannot carry the new load, a panel or service upgrade becomes part of the rough-in rather than an optional extra.
Concealed conditions. Dry rot, previous work done without permits, and undersized framing surface only once the walls are open, which is why scope needs a defined route for changes.
Access and staging. Narrow lots and limited debris access add labour to every phase, including demolition haul-out.
We scope these against your property rather than a per-square-foot average, because on a gut remodel the averages hide exactly the variables listed above.